Saturday, July 10, 2021

2010 Mercedes Benz C 300 (204.054) V6-3.0L (272.947) Page 142


- A -ConnectionTest cable 35-pin socket box



- 001 -Sockets of component N3/10 (ME-SFI [ME] control unit)



- 05 -35-pin socket box



- 050 -126-pin socket box



- 108 -Test cable 266 589 01 63 00



- N3/10 (ME-SFI [ME] control unit)



- II 1-63ConnectionTest cable



- III 64-126ConnectionTest cable



Warning!



-



- Connection A of test cable 108 may NOT be connected to connection B of the 126-pin socket box (050).



Continue to test with button F2



Test voltage supply of circuit 15.



Test sequence



- Measure direct voltage with multimeter between sockets [ F.2 ] 98 and [ F.15 ] 111 of the 35-pole socket box tester.



- Switch on ignition.



Specified value



- Voltage[11.0...15.0] V



Question



- Is the measurement value OK?



YES



The measurement value is OK.End of test



NO



The measurement value is not OK.Possible cause and remedy



- N10/1kP (Circuit 15 relay)

No comments:

Post a Comment