Sunday, December 29, 2019

2010 Mercedes Benz C 300 (204.054) V6-3.0L (272.947) Page 390


End of test



3.3. Test voltage supply of circuit 87.



Connect socket box to component N3/10 (ME-SFI [ME] control unit).



Figure legend



- A -ConnectionTest cable 35-pin socket box



- 001 -Sockets of component N3/10 (ME-SFI [ME] control unit)



- 05 -35-pin socket box



- 050 -126-pin socket box



- 108 -Test cable 266 589 01 63 00



- N3/10 (ME-SFI [ME] control unit)



- II 1-63ConnectionTest cable



- III 64-126ConnectionTest cable



Warning!



-



- Connection A of test cable 108 may NOT be connected to connection B of the 126-pin socket box (050).



Continue to test with button F2



Test voltage supply of circuit 87.



Test sequence



- Measure direct voltage with multimeter between sockets [ F.2 ] 98 and [F.3] 99 of the 126-pole socket box tester.



- Measure direct voltage with multimeter between sockets [ F.4 ] 100 and [ F.5 ] 101 of the 126-pole socket box tester.



- Measure direct voltage with multimeter between sockets [ F.6 ] 102 and [ F.5 ] 101 of the 126-pole socket box tester.

No comments:

Post a Comment