Saturday, November 10, 2018

2010 Mercedes Benz C 300 (204.054) V6-3.0L (272.947) Page 1208


- Control unit N3/10 (ME-SFI [ME] control unit)



End of test



1.1.3.3.2.2. Test total resistance of engine compartment CAN.



Test 1.1.3.3.2.2.1: Perform measurement at component X30/5 (Left voltage distributor (CAN) connector).



Test 1.1.3.3.2.2.2: Perform measurement at component N3/10 (ME-SFI [ME] control unit).



1.1.3.3.2.2.1. Perform measurement at component X30/5 (Left voltage distributor (CAN) connector).



Test total resistance of engine compartment CAN.



Figure legend



- X30/5 (Left voltage distributor (CAN) connector)



Test sequence



- Switch off ignition.



- Measurement with multimeter



- (X30/5) 2.Measure resistance with multimeter between pins 2 and 2.1 (X30/5)



Adapter cable no. W220 589 00 99 36 may be used.Specified value



- [55...65]ohms



Question:



- Is the measured value within the specified value range?



YES



The measurement value is OK.End of test



NO



The measurement value is not OK.Possible cause and remedy



- Line from component N3/10 (ME-SFI [ME] control unit) to component X30/5 (Left voltage distributor (CAN) connector)

No comments:

Post a Comment