Test sequence
- Switch off ignition.
- Disconnect coupling M at component N3/10 (ME-SFI [ME] control unit).
- Measure resistance with multimeter between sockets (M.75) 75 and (M.74) 74 of the 126-pole socket box tester.
Specified value
- Resistor[1...10]ohms
Question
- Is the measurement value OK?
YES
The measurement value is OK.End of test
NO
The measurement value is not OK.Possible cause and remedy
- Lines between N3/10 (ME-SFI [ME] control unit) and M16/6m1 (Actuator motor)
- M16/6m1 (Actuator motor)
End of test
1.3. Test voltage supply of the potentiometers of component M16/6 (Throttle valve actuator).
Test prerequisite
- At least one of the relevant actual values is not okay.
- The power supply of component N3/10 (ME-SFI [ME] control unit) is OK.
Test sequence
- Switch off ignition.
- Connect socket box (126-pin) to component N3/10 (ME-SFI [ME] control unit).
- Measure direct voltage with multimeter between sockets (M.39) 39 and (M.43) 43 of the 35-pole socket box tester.
- Switch on ignition.
Specified value
- Voltage[4.75...5.25] V
Question
- Is the measurement value OK?
No comments:
Post a Comment