- Wiring from control unit N3/10 (ME-SFI [ME] control unit) to component Y22/9 (Intake manifold tumble flap switchover valve)
- Y22/9 (Intake manifold tumble flap switchover valve)
1186
Y22/9 (Intake manifold tumble flap switchover valve) : Short circuit to ground (P2009)
Test 1: Check power supply of component N3/10 (ME-SFI [ME] control unit).
Test 2: Arrangement of fuses
Test 3: Power supply
Test 4: Check component Y22/9 (Intake manifold tumble flap switchover valve).
Test 5: Possible cause:
- Y22/9 (Intake manifold tumble flap switchover valve)
- N10/1kI (Circuit 87 relay, engine)
- N10/1f57 (Fuse 57)
- Voltage supply via component Z7/36 (Circuit 87 M2e connector sleeve)
Affected functions:
- Engine output
1. Check power supply of component N3/10 (ME-SFI [ME] control unit).
Test 1.1: Test voltage supply of circuit 87. ( Check using actual value )
Test 1.2: Test voltage supply of circuit 30.
Test 1.3: Test voltage supply of circuit 87.
Test 1.4: Test current consumption of component N10/1kR (Circuit 87 relay, engine).
Test 1.5: Test voltage supply of circuit 15.
1.1. Test voltage supply of circuit 87. ( Check using actual value )
Test prerequisite
- The voltage test at component G1 (Battery) is o.k.
- Ignition ON
Status of relevant actual value:
- Battery voltage:Warning! Communication with ECU required.
Specified value
- Battery voltage[11.0 ... 15.0] V
Question:Is the actual value o.k.?
YES
The actual value is okay.End of test
NO
The actual value is not o.k.Possible cause and remedy
- Test voltage supply of circuit 30.
- Test voltage supply of circuit 87.
1.2. Test voltage supply of circuit 30.
Connect socket box to component N3/10 (ME-SFI [ME] control unit).
Figure legend
- A -ConnectionTest cable 35-pin socket box
- 001 -Sockets of component N3/10 (ME-SFI [ME] control unit)
- 05 -35-pin socket box
- 050 -126-pin socket box
- 108 -Test cable 266 589 01 63 00
No comments:
Post a Comment