Friday, September 17, 2021

2010 Mercedes Benz C 300 (204.054) V6-3.0L (272.947) Page 2538


YES



The measurement value is OK.End of test



NO



The measurement value is not OK.Possible cause and remedy



- Line from component N10/1 (Front SAM control unit with fuse and relay module) to component N15/6 (Sprintshift control module)



End of test



NO



The measurement value is not OK.Possible cause and remedy



- Check fuse "f63" (voltage supply from control unit ASG) in component N10/1 (Front SAM control unit with fuse and relay module).



- Test cables



End of test



Part 2



No CAN message was received from control unit N82 (Battery control module).



1.1.3.2.2.7. Check power supply at control unit N47-5 (ESP, SPS [PML] and BAS control unit).



Test 1.1.3.2.2.7.1: Test voltage of terminal 87 at control unit N47-5 (ESP, SPS [PML] and BAS control unit).



Test 1.1.3.2.2.7.2: Test of cable for voltage supply



Test 1.1.3.2.2.7.3: Test procedure ground cable



1.1.3.2.2.7.1. Test voltage of terminal 87 at control unit N47-5 (ESP, SPS [PML] and BAS control unit).



Test prerequisite



- Battery voltage is OK.



Test sequence



- Switch off ignition.



- Connect socket box.



- Switch on ignition.



- Measure direct voltage with multimeter between sockets (2.23) 57 and (2.14) 48 of the 126-pole socket box tester.

No comments:

Post a Comment