2000 Porsche Boxster (986) F6-2.7L Page 52

10. Check the position of the brake pedal -Dimension X 45 + 5 mm-. Perform measurement between the centre of the brake pedal plate and the

accelerator. Perform a fine adjustment of the brake pushrod if the correct position of the brake pedal is not given.

- Precise adjustment of brake pushrods: Undo the lock nut for this purpose and the turn the push rod accordingly at the hexagon -arrowuntil -dimension X 45 + 5 mm- has been achieved. Subsequently re-tighten the the lock nut.

11. Check the setting of the brake light switch -1-.

The pedal must move a perceptible distance of approx. 5 to 10 mm before the brake light, lights up. At the same time, check (make sure) that

the brake light, lights up before the pedal meets perceptible resistance or before brake pressure builds up. If necessary, set.re-adjust --> Rep.

Gr. 46; Check brake-light setting.

12. Fit the bellows -B- to the connection sleeve -7.1- and secure with the screw clamp -arrow-.

13. If necessary, fit the alarm horn to the intermediate piece and clip in the air-conditioning line.

14. Install hydraulic unit.

15. Bleed brake Serv. No. 47 01 07 (vehicle with and without TC).

Note!

^ First bleed brakes as usual!

Comments